Resource Type

Journal Article 1110

Conference Videos 25

Year

2024 2

2023 81

2022 109

2021 89

2020 71

2019 63

2018 76

2017 68

2016 66

2015 61

2014 37

2013 48

2012 34

2011 49

2010 33

2009 22

2008 40

2007 32

2006 28

2005 18

open ︾

Keywords

Three Gorges Project 33

multi-objective optimization 24

project management 23

scheduling 13

Multi-agent systems 10

Three Gorges Project ship lift 9

Multi-agent system 8

ship lift 8

different 7

sustainable development 7

Software-defined networking (SDN) 6

failure mode 6

optimization 6

construction project 5

genetic algorithm 5

multi-objective 5

concrete 4

construction management 4

innovation 4

open ︾

Search scope:

排序: Display mode:

Multi-objective optimization for the multi-mode finance-based project scheduling problem

Sameh Al-SHIHABI, Mohammad AlDURGAM

Frontiers of Engineering Management 2020, Volume 7, Issue 2,   Pages 223-237 doi: 10.1007/s42524-020-0097-1

Abstract: The finance-based scheduling problem (FBSP) is about scheduling project activities without exceedingThe FBSP is extended to consider different execution modes that result in the multi-mode FBSP (MMFBSPMoreover, its current version, CPLEX 12.9, solves multi-objective optimization problems.This study presents a mixed-integer linear programming model for the multi-objective MMFBSP.Using CPLEX 12.9, we discuss several techniques that researchers can use to optimize a multi-objective

Keywords: multi-objective optimization     finance-based scheduling     multi-mode project scheduling     mixed-integer linear    

Hybrid genetic algorithm for bi-objective resource-constrained project scheduling

Fikri KUCUKSAYACIGIL, Gündüz ULUSOY

Frontiers of Engineering Management 2020, Volume 7, Issue 3,   Pages 426-446 doi: 10.1007/s42524-020-0100-x

Abstract: In this study, we considered a bi-objective, multi-project, multi-mode resource-constrained project scheduling

Keywords: backward–forward scheduling     hybrid bi-objective genetic algorithm     injection procedure     maximum cash balance     multi-objective multi-project multi-mode resource-constrained project scheduling problem    

Real-Time Assessment and Diagnosis of Process Operating Performance

Shabnam Sedghi,Biao Huang

Engineering 2017, Volume 3, Issue 2,   Pages 214-219 doi: 10.1016/J.ENG.2017.02.004

Abstract: On the other hand, the operating region in each operating mode can alter, due to uncertainties.this paper, we will establish an optimality assessment framework for processes that typically have multi-mode, multi-region operations, as well as transitions between different modes.The kernel density approach for mode detection is adopted and improved for operating mode detection.In addition, multi-modal behavior of steady-state modes is tackled utilizing the mixture probabilistic

Keywords: Optimality assessment     Probabilistic principal component regression     Multi-mode    

A Multi-objective Optimization Decision-making Model for Project Time - resource Tradeoff Problem

Wang Xianjia,Wan Zhongping

Strategic Study of CAE 2005, Volume 7, Issue 2,   Pages 35-40

Abstract:

In the project scheduling and management, the time-resource tradeoff problem is to seek the objectiveof minimizing the project duration and the total consumed-resources cost under the requirement of theabsolute due date of project, and determine an efficient project scheduling according to some precedenceA new multi-objective optimization decision-making model with time-resource tradeoff problem is proposedwhich objective functions with conflict one another are defined as adaptive and adjustable between the project

Keywords: project scheduling management     time-resource tradeoff     multiobject decision-making model     resource-constrained     project scheduling     Lagragian relaxation    

Satellite scheduling engine: The intelligent solver for future multi-satellite management

Frontiers of Engineering Management 2022, Volume 9, Issue 4,   Pages 683-688 doi: 10.1007/s42524-022-0222-4

Multi-timescale optimization scheduling of interconnected data centers based on model predictive control

Frontiers in Energy doi: 10.1007/s11708-023-0912-6

Abstract: In this paper, a multi-timescale optimal scheduling model is established for interconnected data centersaims at the lowest power fluctuation, eliminating the impact of prediction errors through coordinated multi-timescale

Keywords: model predictive control     interconnected data center     multi-timescale     optimized scheduling     distributed    

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

Frontiers of Mechanical Engineering 2015, Volume 10, Issue 4,   Pages 392-404 doi: 10.1007/s11465-015-0353-y

Abstract: overall performance of modern manufacturing systems, effective integration of process planning and schedulingOwing to the complexity of handling process planning and scheduling simultaneously, most of the researchwork has been limited to solving the integrated process planning and scheduling (IPPS) problem for aAs there are many conflicting objectives when dealing with process planning and scheduling, real worldTherefore considering multi-objective IPPS (MOIPPS) problem is inevitable.

Keywords: integrated process planning and scheduling (IPPS)     dispatching rules     priority based optimization algorithm     multi-objective optimization    

Energy-aware fuzzy job-shop scheduling for engine remanufacturing at the multi-machine level

Jiali ZHAO, Shitong PENG, Tao LI, Shengping LV, Mengyun LI, Hongchao ZHANG

Frontiers of Mechanical Engineering 2019, Volume 14, Issue 4,   Pages 474-488 doi: 10.1007/s11465-019-0560-z

Abstract: resulted in increased possibilities of energy conservation during the remanufacturing process, and schedulingHowever, only a few studies have specifically addressed energy-efficient scheduling for remanufacturingadaptive genetic algorithm was developed by using the hormone modulation mechanism to deal with the schedulingComputational results indicated that the optimal scheduling scheme is expected to generate 1.7 kW∙h ofbasis for production managers to improve the sustainability of remanufacturing through energy-aware scheduling

Keywords: remanufacturing scheduling     adaptive genetic algorithm     energy efficiency     sustainable remanufacturing     hormone    

Active-reactive power scheduling of integrated electricity-gas network with multi-microgrids

Frontiers in Energy 2023, Volume 17, Issue 2,   Pages 251-265 doi: 10.1007/s11708-022-0857-1

Abstract: This paper proposes a day-ahead active-reactive power scheduling model for the IEGN with multi-microgridscoupling relationship between the subsystems of the IEGN, the potentialities of the IEGN with MMGs toward multi-energysecond-order cone (SOC) relaxation technology is utilized to transform the proposed active-reactive power schedulingtest system and a 7-node natural gas network is adopted to verify the effectiveness of the proposed schedulingThe results show that the proposed scheduling method can effectively reduce the power losses of the PDN

Keywords: combined cooling     heating     and power (CCHP)     integrated energy systems (IES)     natural gas     power distribution system     gas distribution system    

A carbon efficiency upgrading method for mechanical machining based on scheduling optimization strategy

Shuo ZHU, Hua ZHANG, Zhigang JIANG, Bernard HON

Frontiers of Mechanical Engineering 2020, Volume 15, Issue 2,   Pages 338-350 doi: 10.1007/s11465-019-0572-8

Abstract: In this paper, a two-stage low-carbon scheduling optimization method of job shop is presented as part

Keywords: Low-carbon manufacturing     carbon efficiency     multi-objective optimization     two-stage scheduling     job shop    

Management Mode and Concrete Construction for the Three Gorges Project

Cao Guangjing

Strategic Study of CAE 2004, Volume 6, Issue 8,   Pages 82-85

Abstract:

The Three Gorges Project (TGP) is the largest concrete structure in the current world.The Project, with a total amount of approximately 28 million m3 of concrete, is characterizedThrough a decade of engineering practice, a management mode with the TGP's characteristics has beenDesign, construction and management measures adopted for the concrete works of the Project are discussed

Keywords: Three Gorges Project     management mode     concrete    

Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges

Mario VANHOUCKE

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 133-149 doi: 10.15302/J-FEM-2018088

Abstract: is an invited request to describe the main research challenges in the domain of resource-constrained projectscheduling.

Keywords: project management     project scheduling     resource constraints     PERT/CPM     RCPSP    

Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving

Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB

Frontiers of Engineering Management 2022, Volume 9, Issue 1,   Pages 117-134 doi: 10.1007/s42524-020-0115-3

Abstract: In this study, a mixed-integer programming model consisting of game theory and project scheduling isThis model can act dynamically in all circumstances during project implementation.

Keywords: project scheduling     resource leveling between projects     constrained resources     game theory     Benders decomposition    

How does the improved DB mode degrade the complex integrity of infrastructure mega-projects?Evidence from the Hong Kong-Zhuhai-Macao Bridge project in China

Jinwen ZHANG, Yumin QIU

Frontiers of Engineering Management 2018, Volume 5, Issue 1,   Pages 40-51 doi: 10.15302/J-FEM-2018083

Abstract: analyzes the complex integrity of the island-tunnel subproject of the Hong Kong-Zhuhai-Macao Bridge (HZMB) projectand proposes an improved design-build (DB) mode in which the owner provides a preliminary design andThis improved DB mode creatively degrades the special complexities that arise from multiple dimensions

Keywords: Hong Kong-Zhuhai-Macao Bridge project     island-tunnel subproject     complex integrity     complexity degradation     the general contracting mode of design-build     the design-build consortium    

Analysis of synergy degree and its influencing factors in hydropower EPC project management

Jiwei ZHU, Hua GAO, Jiangrui WANG

Frontiers of Engineering Management 2021, Volume 8, Issue 3,   Pages 402-411 doi: 10.1007/s42524-020-0098-0

Abstract: The use of engineering procurement construction (EPC) mode is currently a trend in hydropower engineeringIn this work, a three-dimensional system and a system model of hydropower EPC project management synergyThus, this study aims to facilitate the hydropower EPC project management synergy, provide a quantitativestage is low, which is the major restriction on the further improvement of the synergy degree of EPC projectThe key factors in improving the synergy level of hydropower EPC project management are mainly concentrated

Keywords: hydropower project     EPC mode     synergy degree model     grey relational analysis    

Title Author Date Type Operation

Multi-objective optimization for the multi-mode finance-based project scheduling problem

Sameh Al-SHIHABI, Mohammad AlDURGAM

Journal Article

Hybrid genetic algorithm for bi-objective resource-constrained project scheduling

Fikri KUCUKSAYACIGIL, Gündüz ULUSOY

Journal Article

Real-Time Assessment and Diagnosis of Process Operating Performance

Shabnam Sedghi,Biao Huang

Journal Article

A Multi-objective Optimization Decision-making Model for Project Time - resource Tradeoff Problem

Wang Xianjia,Wan Zhongping

Journal Article

Satellite scheduling engine: The intelligent solver for future multi-satellite management

Journal Article

Multi-timescale optimization scheduling of interconnected data centers based on model predictive control

Journal Article

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

Journal Article

Energy-aware fuzzy job-shop scheduling for engine remanufacturing at the multi-machine level

Jiali ZHAO, Shitong PENG, Tao LI, Shengping LV, Mengyun LI, Hongchao ZHANG

Journal Article

Active-reactive power scheduling of integrated electricity-gas network with multi-microgrids

Journal Article

A carbon efficiency upgrading method for mechanical machining based on scheduling optimization strategy

Shuo ZHU, Hua ZHANG, Zhigang JIANG, Bernard HON

Journal Article

Management Mode and Concrete Construction for the Three Gorges Project

Cao Guangjing

Journal Article

Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges

Mario VANHOUCKE

Journal Article

Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving

Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB

Journal Article

How does the improved DB mode degrade the complex integrity of infrastructure mega-projects?Evidence from the Hong Kong-Zhuhai-Macao Bridge project in China

Jinwen ZHANG, Yumin QIU

Journal Article

Analysis of synergy degree and its influencing factors in hydropower EPC project management

Jiwei ZHU, Hua GAO, Jiangrui WANG

Journal Article